On the Critical Path poster

On the Critical Path

7.0 / 1019710h 22m

Synopsis

Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.

Genre: Documentary

Status: Released

Director: N/A

Website: Official Website

StreamPilot helps you discover where to watch movies legally. Free streaming availability may vary by title and region.